Wigan

Wigan planned a trial of a permanent under-pavement cable charging solution, with no upfront installation cost for residents.

Key facts

Council scheme
Greater Manchester Combined Authority applied for government funding on Wigan's behalf. In 2025 the council said a trial of a permanent under-pavement cable solution was due to start, with zero upfront installation costs for residents taking part.
Cross-pavement policy
Residents can't arrange their own cross-pavement channels. Trial only.

Charging an EV in Wigan without a driveway

Wigan is taking a different approach to many councils: a trial of a permanent under-pavement cable – the charging cable runs below the footway to a connection point at the kerb.

Key points

  • Funding was applied for through Greater Manchester Combined Authority
  • No upfront installation cost for residents in the trial
  • You can't arrange your own pavement channel outside the trial

Related: Manchester · How to charge an electric car without a driveway · All council guides

Frequently asked questions

Last updated 16 October 2026