If you live in England, park on the street and want to charge an electric car from your own home, an important change arrives on 21 October 2026.
New planning rules make qualifying pavement cable channels – also called charging gullies – "permitted development". In plain English, that means you won't normally need to apply separately for planning permission for the channel.
What is a pavement cable channel?
A pavement cable channel is a narrow, flush channel set into the pavement between your front wall and the kerb. When you charge, your cable sits safely inside it, so it isn't a trip hazard. When you finish, you take the cable out.
It means you can use your home charger and your home electricity tariff, which is usually far cheaper than public charging.
What exactly is changing?
The government's new planning order was laid before Parliament on 30 September 2026 and comes into force on 21 October 2026. It adds a new permitted development right (known as Class F) for a "cross-pavement solution", defined as a pavement-embedded cable channel that lets an EV charging cable safely cross a footway from a home to a parked vehicle.
The rights covering wall-mounted home chargers have also been updated to work alongside it.
What isn't changing
This is the part many headlines skip:
- You still need your council's approval. Your council, as highway authority, owns the pavement. You'll still need to apply to them, and many councils require a licence and an annual fee.
- Only proper pavement-embedded channels count. Covers, mats or ramps laid on top of the pavement are not covered by the new right.
- Some homes are excluded. Heritage restrictions apply, so listed buildings and some protected areas may still need permission.
- It's England only. Scotland, Wales and Northern Ireland have their own rules.
- No parking space comes with it. A channel doesn't reserve the space outside your home.
Is my council offering channels?
More councils are joining in. Research by Vauxhall in April 2026 found that around 42% of councils that responded expected to offer cross-pavement charging by the end of 2026. At that point 7 had live schemes, 21 were trialling and 28 were planning to launch.
Schemes vary a lot. For example:
- Oxfordshire – residents in the subsidised pilot pay £300, covering the survey, installation and first two years' licence.
- Cornwall – government funding can cover the cost of fitting the channel for eligible residents.
- Wandsworth – a £1,000 grant towards each channel, with a £100 application fee.
See all the councils we've covered on our charging without a driveway page.
How to apply: a simple checklist
- Search your council's website for "EV cable channel", "cross-pavement charging" or "charging gully".
- Check you're eligible. Councils typically want you to own or live in the home, have no off-street parking and be able to park legally outside.
- Apply for a survey. The council will check pavement width, street furniture and safety.
- Arrange your home charger using a qualified installer, and check whether any grant is available.
- Sort your insurance. Some councils require public liability cover for the cable on the highway.
- Get your licence and start charging.
Is it worth it?
If you do a reasonable mileage, it can be. Charging at home on an off-peak EV tariff typically costs a fraction of public charging. For example, a popular smart EV tariff charges 7.6p per kWh overnight, against an average of 79p per kWh at public rapid chargers (Zapmap, September 2026).
Our fuel vs electric cost calculator is coming soon, so you can work out the difference for your own driving.
This guide is general information, not legal or planning advice. Always check your council's current process and the conditions that apply to your property before you install anything.
Frequently asked questions
Last updated 16 October 2026